FLI steel tower for Telecoms at hinkley Point C

No Content Available

FLI Structures’ steel tower helps grow telecoms at Hinkley Point C.

As construction activity at Hinkley Point C increases so do the site’s telecoms requirements.  FLI Structures has designed, manufactured and installed, on time and on budget, a 45 metre communication tower enabling the deployment of various services including mobile telephone networks across the site.

Hinkley Point C is a large scheme, with the number of contractors on site ramping up over the next few years as the build develops. Suppliers with both experience in delivering volume over sustained periods to major projects and flexibility with design and supply over short time frames will be part of the mix that keeps contractor’s programmes on schedule.

FLI Structures is a steel fabricator with two factories and a large storage facility in Gloucester, close to Somerset and the Hinkley Point C site. Accredited as ‘Fit For Nuclear’ with all the quality and traceability that the standard requires, we are active across the energy, rail, highways, defence and telecoms sectors. A framework supplier to Network Rail electrification projects, we own the designs to over 60% of the UK mobile phone tower network and have full design, manufacture, storage and installation capabilities completely in-house.