Rapid Deployment Foundations

These Rapid Deployment Foundations save a significant amount of time on site because they remove the need for wet trades.

When the steel grillage is mounted on screw piles, a complete MS4 or portal gantry foundation and platform can be installed in 5 consecutive shifts. It is an adaptable technology able to bridge services, sit close to existing obstructions and cope with the steeply sloping sites and soft ground, which can be difficult for a mass concrete solution.

Live motorway signage with screw pile foundation and staging platform by FLI Structures

Smart Motorway Foundations

FLI designs, fabricate and install a wide range of steel foundations for gantries, bridges and post signs as well as superstructures for signage and platforms. We design for fast and safe installation, developing structures that reduce programme risk and costs.

Staging with cabinets on live motorway signage