LOC Staging
Staging & foundation installed together in a single shift.
1.3T reduction in CO2 (double LOC) over previous models.
45% weight reduction over previous model.
Reduced transport and handling costs.

LOC Staging MK4 - Minumum Viable Product
Compact design 1.8m x 2.8m.
Lightweight steel & GRP.
55% reduction in the number of parts over the previous the model.
Form G sign-off/approval.
Improved Safety
The new LOC platforms provide a safer working environment with GRP flooring and handrails significantly increasing protection against stray current. They do this whilst maintaining the cost, installation and sustainability advantages of the steel frame and foundation.
Safer working on slopes
Access to cables from above via a removable panel. An integral firebox is accessed from above, with direct connection to the cable trough, for faster connection and maintenance.
LOC MK4 Screw Piles
Group of 4 lightweight Ø 88mm screw pile foundations.
Installed either using an RRV or with a hand held kit.

LOC Single Screw Pile
Image shows a Ø 355mm screw pile foundation.
Interface plate included.
Pile & LOC staging can be installed in a single shift.
Reduced time on site, enhances site safety.

Fewer piles with cantilevered platforms
Double and triple LOC’s use 4 piles rather than the standard 6 and 8 piles.
Quad LOC uses 8 piles rather than the standard 10.

LOC MK4 General Assembly