Client: J. Murphy
Tight Deadlines
Limited time for design phase, with last-minute design changes, converting two gantries from accessible to non-accessible
Logistics and coordination
Complex planning was required for fabrication, lifting and assembly amid overlapping contractors and access restrictions.
On-site delays
FLI project managers and engineers also dealt with incomplete enabling works, plant breakdowns and obstructing OLE cables.
Information on signalling structures