Client: Network Rail
FLI delivered the rollout of a new type of OLE (F&F) for the electrification of the PAD to Cardiff route, including Series 1 masts and booms. The project involved parallel design and build work under high-profile, time-critical conditions, with significant demand for steelwork.
FLI’s innovative Flexi-Cap design, developed in-house, was implemented to improve installation efficiency and adaptability.