Case Study:


Thanet Parkway

Client:                  BAM Nuttall
Project Value:     £1.2m
Scope Of Work:  Design, supply & installation of 380 screw piles to support a new

                               400m station platform.

This project involved the design, supply, and installation of over 350 
piles with bracing for Thanet Parkway station for BAM Nuttall, including stairs and 
cabinet supports across a complex site with variable ground conditions. A 
3D pile model and standardised components were developed to simplify 
design and installation, ensuring all elements fitted accurately without on-site steel adjustments.
Parts were colour-coded, pre-labelled, and delivered in line with the 
optimised installation plan for weekend blockades. Tolerance-absorbing 
interfaces and detailed drawings enabled rapid, precise assembly, including 
50 large-diameter piles. While live support and testing verified design 
performance. 