Client Name: Alun Griffiths
FLI installed 9 metre long alternating screw piles to create a robust foundation for the Sparke Evans Bridge in Bristol. Overcoming heavy rain and waterlogged ground, installed in conjunction with our approved partner COWAP, the piles achieved design depth and torque, ensuring reliable performance in challenging conditions.
FLI’s solution provides a foundation for a 60 m-long access ramp for a bridge over the River Avon. This project demonstrates how screw piles deliver stability, adaptability, and efficiency, even in constraining and adverse ground conditions.
Information on sustainability