Client: e-Smart Networks
FLI delivered the design, supply and installation of a screw pile foundation and associated structural steelwork package to elevate the substation structure above ground level for flood mitigation in a location with poor ground conditions.
Steel piles and interface grillage, support control room, transformer and ormazabal room, with assess via staircase.