Case Study:
 

ButterFLI Strengthening Solutions

Client:                 MBNL
Project Value:    £3M
Scope of work:  Develop,design, supply & install the ButterFLI solution to strengthen corroding

                             and failing tower legs.

MBNL identified widespread corrosion at the legs of its towers across the national network and engaged FLI to develop a strengthening solution. In response, FLI engineered ButterFLI, a range of steel solutions designed to arrest and bypass corrosion related degradation and extend tower life without replacing modules, foundations or complete towers. ButterFLI was designed, supplied and installed across the country, strengthening third-party assets and restoring structural integrity. The solution was subsequently granted a patent.

More information on ButterFLI

Contact for ButterFLI

Shop for ButterFLI