Case Study:


Row Brow - Strengthening Steelwork

Client:                   Beacon Comms
Project Value:     £22K
Scope Of Work:  Design and supply of structural steelwork to strengthen a telecoms tower

                               for upgraded AD3000T equipment.​

The Row Brow project, located in Scarborough, involved the design and supply of specialist structural steelwork to strengthen an existing telecommunications tower. Delivered for Beacon Comms, the project focused on enhancing the tower’s load-bearing capacity to support upgraded equipment, specifically AD3000T modules.

Information on strengthening & GDCs

Tower contact